Following the blacktop paving of a larger parking lot in late 1993, several improvements to the post ground were completed in 1993 and 1994. Turkey Shoot target area and a new target house were built. The new pavilion which is covered houses the target house, tables, and turkey shoot supplies. In addition, a new storage facility, 20 feet by 40 feet metal storage building was erected just across the drive on the south side of the Post 99 building. It is wired with 220 volt single phase AC power and ha two (2) four (4) foot wide doors. This will make it easy to store equipment that had been stored in the main building and will also provide storage for grounds maintenance equipment.