Right end cooler opening look at back door in storage room 2/07/19

End of bar and kitchen door 2/07/19

Supplies stacked looking at area pool table was set up 2/07/19

Temporary office and east end of bar area 2/07/19

Hallway to men’s room. Noticed the old drinking faucet has been removed 2/13/19

End of bar with opening to kitchen 2/13/19

View of the full length of bar 2/13/19

Kitchen door with new door casing. Kitchen floor with new grease trap installed in the floor. 2/13/19

New walls in the office 2/13/19

2/13/19. Storage room off kitchen

2/13/19. New wall separating storage room from kitchen. New electrical panel box

2/13/19. View of kitchen


2/13/19 corner of bar with new plumbing installed under the floor

2/13/19

2/15/19

2/15/19

2/15/19 new ceiling and lights

2/15/19

2/15/19

2/15/19

2/20/19. Approval was given by the insurance co toreplace the bar top.

2/20/19. Two sections of the bar top on the floor behind the bar

2/20/19 more sections of the old bar

2/20/19