Right end cooler opening look at back door in storage room 2/07/19
End of bar and kitchen door 2/07/19
Supplies stacked looking at area pool table was set up 2/07/19
Temporary office and east end of bar area 2/07/19
Hallway to men’s room. Noticed the old drinking faucet has been removed 2/13/19
End of bar with opening to kitchen 2/13/19
View of the full length of bar 2/13/19
Kitchen door with new door casing. Kitchen floor with new grease trap installed in the floor. 2/13/19
New walls in the office 2/13/19
2/13/19. Storage room off kitchen
2/13/19. New wall separating storage room from kitchen. New electrical panel box
2/13/19. View of kitchen
2/13/19 corner of bar with new plumbing installed under the floor
2/13/19
2/15/19
2/15/19
2/15/19 new ceiling and lights
2/15/19
2/15/19
2/15/19
2/20/19. Approval was given by the insurance co toreplace the bar top.
2/20/19. Two sections of the bar top on the floor behind the bar
2/20/19 more sections of the old bar
2/20/19
View more photo galleries by Post 915 in Central Square, New York