Bar and kitchen area

 

 

Right end cooler opening look at back door in storage room 2/07/19

 

End of bar and kitchen door 2/07/19

 

Supplies stacked looking at area pool table was set up 2/07/19

 

Temporary office and east end of bar area 2/07/19

 

Hallway to men’s room. Noticed the old drinking faucet has been removed 2/13/19

 

End of bar with opening to kitchen 2/13/19

 

View of the full length of bar 2/13/19

 

Kitchen door with new door casing. Kitchen floor with new grease trap installed in the floor. 2/13/19

 

New walls in the office 2/13/19

 

2/13/19. Storage room off kitchen

 

2/13/19. New wall separating storage room from kitchen. New electrical panel box

 

2/13/19. View of kitchen

 

 

2/13/19 corner of bar with new plumbing installed under the floor

 

2/13/19

 

2/15/19

 

2/15/19

 

2/15/19 new ceiling and lights

 

2/15/19

 

2/15/19

 

2/15/19

 

2/20/19. Approval was given by the insurance co toreplace the bar top.

 

2/20/19. Two sections of the bar top on the floor behind the bar

 

2/20/19 more sections of the old bar

 

2/20/19

 